Gypsum partitions built plumb, flush and finished

Office partitioning, false ceilings, drywall systems and fire-rated or acoustic walls — designed, supplied and installed by a team that measures twice and leaves you with straight lines.

Plumb

Every wall, every time
Serving UAE fit-outs
1 + yrs

Fire-rated

Walls available
Book a technician →

- WHAT WE COVER

Every type of gypsum &
drywall system

Standard office dividers, acoustic walls, fire-rated systems, feature ceilings and curved partition walls — all built on steel stud framing and finished to a paintable surface.

01

Office partitioning

Steel stud and gypsum board office dividers — single or double skin, with or without glass panels and doors.

02

False & suspended ceilings

Gypsum board and metal tile suspended ceilings — flat, stepped, cofferred and curved profiles.

03

Fire-rated partition walls

1hr and 2hr fire-rated gypsum systems built to UAE civil defence requirements for offices and warehouses.

04

Acoustic drywall systems

High-performance acoustic partition walls for meeting rooms, studios and noise-sensitive office spaces.

05

Wall lining & dot-and-dab

Dot-and-dab gypsum lining boards for masonry walls — insulated, moisture-resistant and standard.

06

Feature walls & curves

Curved drywall partitions, bulkheads, feature arch walls and decorative recesses for residential spaces.

- HOW A CALLOUT WORKS

From survey to a finished, painted surface

A real sequence we follow on every gypsum partition job — no guess-work, just straight walls.

01

You call or book

Tell us the layout and use — we arrange a free site survey.

02

Site survey

Dimensions taken, system type agreed (standard, fire-rated, acoustic).

03

Upfront quote

Fixed price covering steel stud, board, tape, joint finish and labour.

04

Frame & board

Steel stud frame erected, gypsum boards fixed, penetrations sealed.

05

Tape & Finish

Joints taped, filled, sanded to a paintable surface — ready for your decorator.

- SERVICE AREA

Based in Jebel Ali Free Zone, dispatched across Dubai

Our gypsum team is based out of Jebel Ali Industrial Area — fastest response inside the Free Zone, with same-day coverage across greater Dubai.

Jebel Ali Free Zone (JAFZA)

~25 min

Jebel Ali Industrial Area

~20 min

Dubai Investment Park

Same Day

Discovery Gardens / Al Furjan

Same Day

Dubai Citywide

Next Day

- COMMON QUESTIONS

Gypsum partition works FAQ

What's the lead time from site survey to installation starting?

For standard office partitions we typically start within 2–3 working days of the survey. Larger projects or fire-rated systems may take a day or two longer to source specific boards.

 
 
Do you build fire-rated gypsum walls to UAE standards?

Yes. We build 1-hour and 2-hour fire-rated gypsum partition systems that meet UAE Civil Defence requirements, using certified board and tested systems.

Do you provide a written quote before starting work?

Yes. Every partition project gets a fixed, upfront quote after the site survey — covering stud, board, tape, finish and labour — before we start.

 
Can you do acoustic walls for meeting rooms?

Yes. We install high-performance acoustic drywall systems using resilient channels and dense acoustic board to achieve the STC ratings meeting rooms typically need.

 
Do you finish the walls to a paintable surface, or just board?

We finish all joints, tape and fill to a smooth, paintable surface. You can then paint or wallpaper directly — no additional plastering required.

 

Ready for walls that are perfectly plumb?

Book a free site survey today — our gypsum partition team is based in Jebel Ali and ready to quote.